Before Picture of 2.7 Mile by Klawock Airport; courtesy of Elizabeth Reyes:
Upper Steelhead courtesy of Elizabeth Reyes:
After Clean Up Pictures at the Klawock Airport Mile 2.7; courtesy of Katherine Stone:
Landslide Videos Courtesy of Frank Peratovich:
Clean up of Port St. Nick Mile 2.7 Courtesy of Richard Trojan:
Port St Nick 2.7 mile slide clean up. Chuck Haydo brought his excavator. Joe Stiller drove his dump truck. Tyler rental delivered a excavator. City of Craig had a wheel hoe and two 5 yard trucks. CTA brought out a big wheel loader. Trojan and son had a wheel hoe on a job just down the street and brought blackie out the haul. I counted 18 loads and probably missed a few in the count.
Landslide Port St. Nick Courtesy of Stina Collins
Update from the City of Craig Tuesday Evening:
PSN Road Closure Update: Crews are still working to clear the blocked culvert and water at 4.3 mile PSN Road. There is standing water above the road and water running across the road. In addition, the bank on the lower side of the road has eroded some. CREWS WILL BE POSTING "ROAD CLOSED" SIGNS AT 4.3 MILE. LOCAL RESIDENTS MAY MOVE THE SIGNS AND PROCEED PAST THIS POINT AT THEIR OWN RISK. Crews will continue to work on this area tomorrow. Be advised, be prepared to be through this area by 5:30 pm tomorrow, October 28th in case additional closures are necessary.
Share, like and subscribe to this site
Send a tip or a story or a classified or hatemail to powreport@gmail.com
Support this site and make a small donation (and you'll receive the POW Court Report in an email)
Ads just 10$ a month
Support this site and make a small donation (and you'll receive the POW Court Report in an email)
Ads just 10$ a month
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.